文章 from oracle 官网

29.4.5 Setting the Repeat Interval

You can control when and how often a job repeats.

29.4.5.1 About Setting the Repeat Interval

You control when and how often a job repeats by setting the repeat_interval attribute of the job itself or the named schedule that the job references. You can set repeat_interval with DBMS_SCHEDULER package procedures or with Cloud Control.

Evaluating the repeat_interval results in a set of timestamps. The Scheduler runs the job at each timestamp. Note that the start date from the job or schedule also helps determine the resulting set of timestamps. If no value for repeat_interval is specified, the job runs only once at the specified start date.

Immediately after a job starts, the repeat_interval is evaluated to determine the next scheduled execution time of the job. While this might arrive while the job is still running, a new instance of the job does not start until the current one completes.

See Also:

Oracle Database PL/SQL Packages and Types Reference for more information about repeat_interval evaluation

29.4.5.2 Using the Scheduler Calendaring Syntax

The main way to set how often a job repeats is to set the repeat_interval attribute with a Scheduler calendaring expression.

See Also:

Oracle Database PL/SQL Packages and Types Reference for a detailed description of the calendaring syntax for repeat_interval as well as the CREATE_SCHEDULE procedure

Examples of Calendaring Expressions

The following examples illustrate simple repeat intervals. For simplicity, it is assumed that there is no contribution to the evaluation results by the start date.

Run every Friday. (All three examples are equivalent.)

FREQ=DAILY; BYDAY=FRI;
FREQ=WEEKLY; BYDAY=FRI;
FREQ=YEARLY; BYDAY=FRI;

Run every other Friday.

FREQ=WEEKLY; INTERVAL=2; BYDAY=FRI;

Run on the last day of every month.

FREQ=MONTHLY; BYMONTHDAY=-1;

Run on the next to last day of every month.

FREQ=MONTHLY; BYMONTHDAY=-2;

Run on March 10th. (Both examples are equivalent)

FREQ=YEARLY; BYMONTH=MAR; BYMONTHDAY=10;
FREQ=YEARLY; BYDATE=0310;

Run every 10 days.

FREQ=DAILY; INTERVAL=10;

Run daily at 4, 5, and 6PM.

FREQ=DAILY; BYHOUR=16,17,18;

Run on the 15th day of every other month.

FREQ=MONTHLY; INTERVAL=2; BYMONTHDAY=15;

Run on the 29th day of every month.

FREQ=MONTHLY; BYMONTHDAY=29;

Run on the second Wednesday of each month.

FREQ=MONTHLY; BYDAY=2WED;

Run on the last Friday of the year.

FREQ=YEARLY; BYDAY=-1FRI;

Run every 50 hours.

FREQ=HOURLY; INTERVAL=50;

Run on the last day of every other month.

FREQ=MONTHLY; INTERVAL=2; BYMONTHDAY=-1;

Run hourly for the first three days of every month.

FREQ=HOURLY; BYMONTHDAY=1,2,3;

Here are some more complex repeat intervals:

Run on the last workday of every month (assuming that workdays are Monday through Friday).

FREQ=MONTHLY; BYDAY=MON,TUE,WED,THU,FRI; BYSETPOS=-1

Run on the last workday of every month, excluding company holidays. (This example references an existing named schedule called Company_Holidays.)

FREQ=MONTHLY; BYDAY=MON,TUE,WED,THU,FRI; EXCLUDE=Company_Holidays; BYSETPOS=-1

Run at noon every Friday and on company holidays.

FREQ=YEARLY;BYDAY=FRI;BYHOUR=12;INCLUDE=Company_Holidays

Run on these three holidays: July 4th, Memorial Day, and Labor Day. (This example references three existing named schedules, JUL4MEM, and LAB, where each defines a single date corresponding to a holiday.)

JUL4,MEM,LAB

Examples of Calendaring Expression Evaluation

A repeat interval of "FREQ=MINUTELY;INTERVAL=2;BYHOUR=17; BYMINUTE=2,4,5,50,51,7;" with a start date of 28-FEB-2004 23:00:00 will generate the following schedule:

SUN 29-FEB-2004 17:02:00
SUN 29-FEB-2004 17:04:00
SUN 29-FEB-2004 17:50:00
MON 01-MAR-2004 17:02:00
MON 01-MAR-2004 17:04:00
MON 01-MAR-2004 17:50:00
...

A repeat interval of "FREQ=MONTHLY;BYMONTHDAY=15,-1" with a start date of 29-DEC-2003 9:00:00 will generate the following schedule:

WED 31-DEC-2003 09:00:00
THU 15-JAN-2004 09:00:00
SAT 31-JAN-2004 09:00:00
SUN 15-FEB-2004 09:00:00
SUN 29-FEB-2004 09:00:00
MON 15-MAR-2004 09:00:00
WED 31-MAR-2004 09:00:00
...

A repeat interval of "FREQ=MONTHLY;" with a start date of 29-DEC-2003 9:00:00 will generate the following schedule. (Note that because there is no BYMONTHDAY clause, the day of month is retrieved from the start date.)

MON 29-DEC-2003 09:00:00
THU 29-JAN-2004 09:00:00
SUN 29-FEB-2004 09:00:00
MON 29-MAR-2004 09:00:00
...

Example of Using a Calendaring Expression

As an example of using the calendaring syntax, consider the following statement:

BEGIN
  DBMS_SCHEDULER.CREATE_JOB (
   job_name             => 'scott.my_job1',
   start_date           => '15-JUL-04 01.00.00 AM Europe/Warsaw',
   repeat_interval      => 'FREQ=MINUTELY; INTERVAL=30;',
   end_date             => '15-SEP-04 01.00.00 AM Europe/Warsaw',
   comments             => 'My comments here');
END;
/

This creates my_job1 in scott. It will run for the first time on July 15th and then run until September 15. The job is run every 30 minutes.

29.4.5.3 Using a PL/SQL Expression

When you need more complicated capabilities than the calendaring syntax provides, you can use PL/SQL expressions. You cannot, however, use PL/SQL expressions for windows or in named schedules. The PL/SQL expression must evaluate to a date or a timestamp.

Other than this restriction, there are no limitations, so with sufficient programming, you can create every possible repeat interval. As an example, consider the following statement:

BEGIN
  DBMS_SCHEDULER.CREATE_JOB (
   job_name             => 'scott.my_job2', 
   start_date           => '15-JUL-04 01.00.00 AM Europe/Warsaw',
   repeat_interval      => 'SYSTIMESTAMP + INTERVAL '30' MINUTE',
   end_date             => '15-SEP-04 01.00.00 AM Europe/Warsaw',
   comments             => 'My comments here');
END;
/

This creates my_job1 in scott. It will run for the first time on July 15th and then every 30 minutes until September 15. The job is run every 30 minutes because repeat_interval is set to SYSTIMESTAMP + INTERVAL '30' MINUTE, which returns a date 30 minutes into the future.

29.4.5.4 Differences Between PL/SQL Expression and Calendaring Syntax Behavior

There are important differences in behavior between a calendaring expression and PL/SQL repeat interval.

These differences include the following:

  • Start date

    • Using the calendaring syntax, the start date is a reference date only. Therefore, the schedule is valid as of this date. It does not mean that the job will start on the start date.

    • Using a PL/SQL expression, the start date represents the actual time that the job will start executing for the first time.

  • Next run time

    As an example of the difference, for a job that is scheduled to start at 2:00 PM and repeat every 2 hours, but actually starts at 2:10:

    • If calendaring syntax specified the repeat interval, then it would repeat at 4, 6 and so on.

    • If a PL/SQL expression is used, then the job would repeat at 4:10, and if the next job actually started at 4:11, then the subsequent run would be at 6:11.

    • Using the calendaring syntax, the next time the job runs is fixed.

    • Using the PL/SQL expression, the next time the job runs depends on the actual start time of the current job run.

To illustrate these two points, consider a situation where you have a start date of 15-July-2003 1:45:00 and you want it to repeat every two hours. A calendar expression of "FREQ=HOURLY; INTERVAL=2; BYMINUTE=0;" will generate the following schedule:

TUE 15-JUL-2003  03:00:00
TUE 15-JUL-2003  05:00:00
TUE 15-JUL-2003  07:00:00
TUE 15-JUL-2003  09:00:00
TUE 15-JUL-2003  11:00:00
...

Note that the calendar expression repeats every two hours on the hour.

A PL/SQL expression of "SYSTIMESTAMP + interval '2' hour", however, might have a run time of the following:

TUE 15-JUL-2003  01:45:00
TUE 15-JUL-2003  03:45:05
TUE 15-JUL-2003  05:45:09
TUE 15-JUL-2003  07:45:14
TUE 15-JUL-2003  09:45:20
...


相关内容

热门资讯

烈焰熊熊,堪比“原子弹”,欧洲... 据美国有线电视新闻网(CNN)7月29日报道,席卷法国西南部的大片野火燃烧得如此猛烈,以至于形成了一...
外交部:对日本熊本县地震遇难者... 据凤凰卫视报道,针对日本熊本县发生强震造成人员伤亡,中国外交部发言人毛宁7月29日在例行记者会上表示...
高铁喧哗被劝阻后叫嚣全家体制内... “女子高铁喧哗被劝阻后叫嚣全家体制内”一事迎来官方通报。据新京报报道,7月29日,辽宁北票市公安局发...
广东专业蓝牙耳机定制厂家推荐,... 在珠三角腹地,广东早已成为全球蓝牙耳机产业链的“心脏地带”。从深圳华强北的声学元件批发,到东莞、惠州...
格雷厄姆葬礼变地缘竞价场!两大... 有些葬礼,送别的是逝者;有些葬礼,演的却是活人最现实的政治博弈。当地时间7月28日,美国老牌鹰派参议...
一道小学数学题难住3名医学博士... 3名不同学校的博士同做一道数学题,谁最厉害?近日,一陕西网友发布的视频引发热议。29日,视频发布者“...
华为全新“小艺任务”亮相:整合... 7月29日,在华为鸿蒙电脑新品技术沟通会上,终端云服务小艺业务部总裁贾永利宣布,小艺将迎来“从对话到...
广西日报特稿《王的猜想》火了,... 澎湃新闻记者 蒋子文 实习生 汤煜炜为应对外界购买纸质版特稿《王的猜想》的热情,《广西日报》宣布紧急...
月租20元内!2026年平价云... 不少手游玩家、账号运营从业者挑选云手机时,首要诉求就是低价够用,想要控制每月支出在20元以内,同时兼...
诺奖得主如何看待王虹境遇?“我... 中村修二(2014年诺贝尔物理学奖得主)【导读】近日王虹与邓煜双双获得2026年菲尔兹奖,成为了首批...